FPM Cereal Milling.

  • Sector / Mining & Resources
  • Services / Abrasive Blasting & Polyurethane Coatings

Full project details

FPM Milling contracted Omega Industries to undertake the pressure cleaning, abrasive blasting and application of a premium polyurethane system to their silos in Tamworth (Regional NSW).

In order to avoid heavy financial implications in the future FPM assets required coatings removal, cleaning and application. The opportunity presented itself when an Omega project manager took a wrong turn on his way to inspect works at the Tamworth Court House project. Instead came across silos and areas of a cereal milling plant that needed attention.

Works required our industrial crew to complete abrasive blasting, high reach access using EWP and repainting areas with a Omethane Two Pack Polyurethane 343. The the completed project met with specification parameters and approved by our technical team in Sydney.

Project facts

An Omega project manager accidentally drove into the FPM site after making a wrong turn. He was confronted by silos that needed an image revamp.

After a short conversation with the site owner, Omega industrial crews were onsite to undertake the pressure cleaning, abrasive blasting and coatings application to the milling silos.

Works were successfully completed by four Omega Industrial specialists within 45 days.