Transformer Blasting & Painting. Industrial Works. Scaffolding & Access

  • Client / Undisclosed
  • Sector / Mining & Resources
  • Services / Abrasive Blasting, Scaffolding & Repainting
  • Duration / 10 Days

Full project details

Omega are preferred specialists in handling rectification works for various energy companies. These particular works involved scaffolding, abrasive blasting and repainting a transformer at station in South West Sydney.

The works involved a three hour induction for every painter, scaffolder and abrasive blaster onsite. As the works were in a high risk environment, a full time safety officer was employed to ensure all personnel were following WHS requirements at all times. Dulux were the specified brand for this project. Products included Dulux Zinc Rich Primer WP, Dulux Durepon P14 Primer and Dulux Luxathane RT. A Dulux representative prepared a COA report approving the application met specification.

Project facts

The senior project manager reviewing the works was brought down from QLD to ensure quality standards were met for each coat.

Works were happening during The State of Origin week. Our NSW Omega painters had to let the QLD project manager know where he was at the entrance of the enclosed site.

All works were completed within 10 days and handed over to a happy client.