Ferrovial-York JV being the head contractor, the multi-million dollar project involves construction, civil works and excavation of seven Noise Barrier Walls along Waringah Road, Frenchs Forest. The painting works involved preparation and pressure washing of approx. 6000 Sq. Mtrs. encompassing concrete panels and steel posts. The duration of the project is 5 months and is due to finish in October 2017.

Transformer Blasting & Painting

Omega are preferred specialists in handling rectification works for various energy companies. These particular works involved scaffolding, abrasive blasting and repainting a transformer at station in South West Sydney.

The works involved a three hour induction for every painter, scaffolder and abrasive blaster onsite. As the works were in a high risk environment, a full time safety officer was employed to ensure all personnel were following WHS requirements at all times.

Dulux were the specified brand for this project. Products included Dulux Zinc Rich Primer WP, Dulux Durepon P14 Primer and Dulux Luxathane RT. A Dulux representative prepared a COA report approving the application met specification.